China wind farms file

 

General data

  Map  

Generalities

Details


Part #1:

  • Turbine(s): (manufacturer name not available)
  • Total nominal power: 1,000 kW
  • Operational
  • Onshore wind farm
  • Operator: China State Power Corp

Part #2:

  • Commissioning:
  • Turbine(s): (manufacturer name not available)
  • Total nominal power: 150,000 kW
  • Operational
  • Onshore wind farm
  • Owner:

Part #3:

  • Commissioning:
  • Turbine(s): (manufacturer name not available)
  • Total nominal power: 50,000 kW
  • Operational
  • Onshore wind farm
  • Owner:

Part #4:

  • City: Buerjing
  • Commissioning:
  • Turbine(s): (manufacturer name not available)
  • Total nominal power: 50,000 kW
  • Operational
  • Onshore wind farm

Part #5:

  • City: Buerjing
  • Commissioning:
  • Turbine(s): (manufacturer name not available)
  • Total nominal power: 50,000 kW
  • Operational
  • Onshore wind farm
  • Operator: Huaneng Group
  • Owner:

Part #6:

  • City: Buerjing
  • Commissioning:
  • Turbine(s): (manufacturer name not available)
  • Total nominal power: 100,000 kW
  • Operational
  • Onshore wind farm
  • Owner:

Part #7:

  • City: Buerjing
  • Commissioning:
  • Turbine(s): (manufacturer name not available)
  • Total nominal power: 50,000 kW
  • Operational
  • Onshore wind farm

Part #8:

  • City: Buerjing
  • Commissioning:
  • Turbine(s): (manufacturer name not available)
  • Total nominal power: 50,000 kW
  • Operational
  • Onshore wind farm

Part #9:

  • City: Buerjing
  • Commissioning:
  • 14 turbines: Goldwind S50/750 (power 750 kW, diameter 50 m)
  • Total nominal power: 10,500 kW
  • Operational
  • Onshore wind farm

Part #10:

  • City: Buerjing
  • Commissioning:
  • 52 turbines: Goldwind S50/750 (power 750 kW, diameter 50 m)
  • Total nominal power: 39,000 kW
  • Operational
  • Onshore wind farm

Part #11:

  • City: Buerjing
  • Commissioning:
  • 33 turbines: Goldwind GW82/1500 (power 1 500 kW, diameter 82.3 m)
  • Total nominal power: 49,500 kW
  • Operational
  • Onshore wind farm
  • Owner:

Part #12:

  • City: Buerjing
  • Turbine(s): (manufacturer name not available)
  • Total nominal power: 100,000 kW
  • Under construction
  • Onshore wind farm

Localisation


Part #1:

  • Latitude: 47° 50' 49.9"
  • Longitude: 86° 42' 51.4"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 42° 28' 49.7"
  • Longitude: 85° 27' 47.8"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 47° 51' 34.9"
  • Longitude: 86° 39' 21.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #4:

  • Latitude: 47° 31' 8.3"
  • Longitude: 86° 16' 44"
  • Geodetic system: WGS84
  • Precise localization: no

Part #5:

  • Latitude: 47° 42' 17.6"
  • Longitude: 86° 51' 3.2"
  • Geodetic system: WGS84
  • Precise localization: no

Part #6:

  • Latitude: 42° 28' 49.7"
  • Longitude: 85° 27' 47.8"
  • Geodetic system: WGS84
  • Precise localization: no

Part #7:

  • Latitude: 47° 37' 25.6"
  • Longitude: 86° 52' 28.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #8:

  • Latitude: 48° 27' 27"
  • Longitude: 86° 58' 22.7"
  • Geodetic system: WGS84
  • Precise localization: no

Part #9:

  • Latitude: 47° 50' 49.9"
  • Longitude: 86° 42' 51.4"
  • Geodetic system: WGS84
  • Precise localization: no

Part #10:

  • Latitude: 47° 50' 49.9"
  • Longitude: 86° 42' 51.4"
  • Geodetic system: WGS84
  • Precise localization: no

Part #11:

  • Latitude: 47° 50' 49.9"
  • Longitude: 86° 42' 51.4"
  • Geodetic system: WGS84
  • Precise localization: no

Part #12:

  • Latitude: 47° 37' 58.8"
  • Longitude: 86° 46' 30"
  • Geodetic system: WGS84
  • Precise localization: no


Update for this sheet: 6 October 2023