Emsdetten windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Emsdetten
- Country: Germany
- County / Zone: Nordrhein-Westfalen
- Total power: 27 MW
- Estimated annual production: 67 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- City: Emsdetten
- Commissioning: 2002
- 2 turbine(s) Südwind S70/1500 (power 1500 kW, diameter 70 m)
- Hub height: 98 m
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
- Developed by: ProWind
- Operator: ProWind
- Owner: ProWind
Part #2:
- City: Emsdetten
- 3 turbine(s) (manufacturer name not available)
- Total nominal power: 165 kW
- Operational
- Onshore wind farm
Part #3:
- City: Emsdetten
- Commissioning: 2003/11
- 11 turbine(s) Vestas V80/2000 (power 2000 kW, diameter 80 m)
- Total nominal power: 22,000 kW
- Operational
- Onshore wind farm
- Developed by: ProWind
- Operator: ProWind
- Owner: ProWind
Part #4:
Update for this sheet: 10/2011
Complete/correct this sheet: contact page