Andretta windfarm (Italy)
[Back to previous page]
Generalities
- Wind farm name: Andretta
- Country: Italy
- County / Zone: Campania
- Total power: 36 MW
- Estimated annual production: 90 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- 5 turbine(s) (manufacturer name not available)
- Total nominal power: 3,300 kW
- Operational
- Onshore wind farm
- Operator: Fri-El
Part #2:
- 22 turbine(s) (manufacturer name not available)
- Total nominal power: 11,000 kW
- Operational
- Onshore wind farm
- Operator: Fri-El
Part #3:
- 11 turbine(s) Vestas V80/2000 (power 2000 kW, diameter 80 m)
- Total nominal power: 22,000 kW
- Operational
- Onshore wind farm
Update for this sheet: 02/2011