Wind power and windfarms database
Greensolver

English English Deutsch Espa˝ol


Eoltech

Online access > Wind farms > Neuenfeld (Germany)


[Back to previous page]

Generalities

PDF

Details


Part #1:

  • City: Neuenfeld
  • Commissioning: 1997
  • 1 turbine: Enercon E40/500 (power 500 kW, diameter 40 m)
  • Total nominal power: 500 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Saturday, December 10 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 71.7 %
  • Expected production: 8,600 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • City: Neuenfeld
  • Commissioning: 1999
  • 1 turbine: Tacke 1.5s (power 1 500 kW, diameter 70.5 m)
  • Total nominal power: 1,500 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Saturday, December 10 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 77.9 %
  • Expected production: 28,060 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • City: Neuenfeld
  • Commissioning: 2001
  • 7 turbines: Enron 1.5sl (power 1 500 kW, diameter 77 m)
  • Total nominal power: 10,500 kW
  • Operational
  • Onshore wind farm
  • Operator: Enertrag
  • Owner: Enertrag

       Production forecast

  • From Saturday, December 10 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 77.9 %
  • Expected production: 196,400 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #4:

  • City: Neuenfeld
  • Commissioning: 2001
  • 6 turbines: Enercon E66/1500 (power 1 500 kW, diameter 66 m)
  • Total nominal power: 9,000 kW
  • Operational
  • Onshore wind farm
  • Operator: Enertrag
  • Owner: Enertrag

       Production forecast

  • From Saturday, December 10 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 71.9 %
  • Expected production: 155,280 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #5:

  • City: Neuenfeld
  • Commissioning: 2011
  • 5 turbines: (manufacturer name not available)
  • Total nominal power: 14,100 kW
  • Operational
  • Onshore wind farm
  • Operator: Enertrag
  • Owner: Enertrag

       Production forecast

  • From Saturday, December 10 2016, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 71.9 %
  • Expected production: 243,280 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Latitude: 53░ 25' 12"
  • Longitude: 14░ 2' 23.9"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #2:

  • Latitude: 53░ 25' 12"
  • Longitude: 14░ 2' 23.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 53░ 25' 12"
  • Longitude: 14░ 2' 23.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #4:

  • Latitude: 53░ 25' 12"
  • Longitude: 14░ 2' 23.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #5:

  • Latitude: 53░ 25' 12"
  • Longitude: 14░ 2' 23.9"
  • Geodetic system: WGS84
  • Precise localization: no

Global map



Pictures


No photos for this wind farm.

Update for this sheet: 06/2016
Complete/correct this sheet:


www.thewindpower.net - 2005-2016 - all rights reserved - contact - partners - advertising