Wind power and windfarms database
Eoltech

English English Deutsch Espa˝ol


Eoltech

Online access > Wind farms > Wehren (Germany)


[Back to previous page]

Generalities

Details



Part #1:

  • City: Wehren
  • Commissioning: 1998/06
  • 8 turbines: Enercon E40/500 (power 500 kW, diameter 40 m)
  • Total nominal power: 4,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Plan 8
  • Operator: Wind7

Part #2:

  • Part: Wehren I
  • City: Wehren
  • Commissioning: 2009
  • 5 turbines: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
  • Total nominal power: 11,500 kW
  • Operational
  • Onshore wind farm
  • Developers: WPD/e3 GmbH
  • Operator: e3 GmbH

Part #3:

  • Part: Wehren I
  • City: Wehren
  • Commissioning: 2010
  • 1 turbine: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
  • Total nominal power: 2,300 kW
  • Operational
  • Onshore wind farm
  • Developers: WPD/e3 GmbH
  • Operator: WPD

Part #4:

  • Part: Wehren II
  • City: Wehren
  • Commissioning: 2011
  • 1 turbine: Enercon E70/2300 (power 2 300 kW, diameter 71 m)
  • Total nominal power: 2,300 kW
  • Operational
  • Onshore wind farm
  • Developers: WPD/e3 GmbH
  • Operator: WPD

Localisation



Part #1:

  • Latitude: 54░ 12' 0"
  • Longitude: 8░ 58' 12"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Part: Wehren I
  • Latitude: 51░ 10' 7"
  • Longitude: 9░ 17' 45.4"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Part: Wehren I
  • Latitude: 54░ 12' 0"
  • Longitude: 8░ 58' 12"
  • Geodetic system: WGS84
  • Precise localization: no

Part #4:

  • Part: Wehren II
  • Latitude: 54░ 12' 0"
  • Longitude: 8░ 58' 12"
  • Geodetic system: WGS84
  • Precise localization: no

Global map




Pictures



No photos for this wind farm.

Update for this sheet: 04/2016
Complete/correct this sheet:


www.thewindpower.net - 2005-2016 - all rights reserved - contact - partners - advertising