Osterhausen II windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Osterhausen II
- Country: Germany
- County / Zone: Sachsen-Anhalt
- Total power: 4 MW
- Estimated annual production: 10 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
- City: Osterhausen
- Commissioning: 2011
- 2 turbine(s) Vestas V90/2000 (power 2000 kW, diameter 90 m)
- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
- Developed by: e.n.o. Energy
- Operator: e.n.o. Energy
Update for this sheet: 10/2012
Complete/correct this sheet: contact page