Monte Treito windfarm (Spain)
[Back to previous page]
Generalities
- Wind farm name: Monte Treito
- Country: Spain
- County / Zone: Galicia
- Total power: 30 MW
- Estimated annual production: 75 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- City: Lousame, Rois, Dodro y Rianxo
- 21 turbine(s) Gamesa G58/850 (power 850 kW, diameter 58 m)
- Total nominal power: 17,850 kW
- Operational
- Onshore wind farm
- Operator: Iberdrola Renewables
Part #2:
- City: Lousame, Rois, Dodro y Rianxo
- 19 turbine(s) Gamesa G47/660 (power 660 kW, diameter 47 m)
- Total nominal power: 12,540 kW
- Operational
- Onshore wind farm
- Operator: Iberdrola Renewables
Update for this sheet: 05/2012
Complete/correct this sheet: contact page