Bustelo windfarm (Spain)
[Back to previous page]
Generalities
- Wind farm name: Bustelo
- Country: Spain
- County / Zone: Galicia
- Total power: 59 MW
- Estimated annual production: 147 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
Part #2:
- Commissioning: 2009
- 9 turbine(s) Enercon E82/2000 (power 2000 kW, diameter 82 m)
- Total nominal power: 18,000 kW
- Operational
- Onshore wind farm
- Developed by: ENEOP
- Operator: ENEOP
- Owner: ENEOP
Part #3:
- City: As Pontes, Muras
- Turbine(s) Gamesa
- Total nominal power: 15,840 kW
- Operational
- Onshore wind farm
Update for this sheet: 05/2012
Complete/correct this sheet: contact page