Masgalán-Campo Do Coco windfarm (Spain)
[Back to previous page]
Generalities
- Wind farm name: Masgalán-Campo Do Coco
- Country: Spain
- County / Zone: Galicia
- Total power: 50 MW
- Estimated annual production: 123 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
- City: Forcarei y Silleda
- 75 turbine(s) Gamesa G47/660 (power 660 kW, diameter 47 m)
- Total nominal power: 49,500 kW
- Operational
- Onshore wind farm
- Operator: Gamesa
Update for this sheet: 05/2012
Complete/correct this sheet: contact page