El Navazo Fase II windfarm (Spain)
[Back to previous page]
Generalities
- Wind farm name: El Navazo Fase II
- Country: Spain
- County / Zone: Castilla y León
- Total power: 10 MW
- Estimated annual production: 24 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- City: Pedrosa del Príncipe y Castrojeriz Astudillo
- 4 turbine(s) Gamesa G80/2000 (power 2000 kW, diameter 80 m)
- Total nominal power: 8,800 kW
- Operational
- Onshore wind farm
- Operator: Iberdrola Renewables
Part #2:
- City: Pedrosa del Príncipe y Castrojeriz Astudillo
- 1 turbine(s) Gamesa G52/850 (power 850 kW, diameter 52 m)
- Total nominal power: 850 kW
- Operational
- Onshore wind farm
- Operator: Iberdrola Renewables
Update for this sheet: 05/2012
Complete/correct this sheet: contact page