El Redondal Fase 2 windfarm (Spain)
[Back to previous page]
Generalities
- Wind farm name: El Redondal Fase 2
- Country: Spain
- County / Zone: Castilla y León
- Total power: 16 MW
- Estimated annual production: 40 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- City: Castropodame y Turienzo Castañero
- 5 turbine(s) Gamesa G52/850 (power 850 kW, diameter 52 m)
- Total nominal power: 4,250 kW
- Operational
- Onshore wind farm
- Operator: Olivento SL
Part #2:
- City: Castropodame y Turienzo Castañero
- 14 turbine(s) Gamesa G58/850 (power 850 kW, diameter 58 m)
- Total nominal power: 11,900 kW
- Operational
- Onshore wind farm
- Operator: Olivento SL
Update for this sheet: 05/2012
Complete/correct this sheet: contact page