Wind power and windfarms database
Eoltech

English English Deutsch Espa˝ol


Eoltech

Online access > Wind farms > La Carracha (Spain)


[Back to previous page]

Generalities

PDF

Details


  • City: La Muela
  • Commissioning: 2002
  • 66 turbines: Neg Micon NM48/750 (power 750 kW, diameter 48.2 m)
  • Total nominal power: 49,500 kW
  • Operational
  • Onshore wind farm
  • Operator: BayWa R.E.

       Production forecast

  • From Thursday, September 01 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 4.6 %
  • Expected production: 54,260 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


  • Latitude: 41░ 34' 47.9"
  • Longitude: -1░ 7' 12"
  • Geodetic system: WGS84
  • Precise localization: no

Global map




Pictures



No photos for this wind farm.

Update for this sheet: 01/2016
Complete/correct this sheet:


www.thewindpower.net - 2005-2016 - all rights reserved - contact - partners - advertising