Mittelstenahe windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Mittelstenahe
- Country: Germany
- County / Zone: Niedersachsen
- Total power: 20 MW
- Estimated annual production: 50 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2006
- 6 turbine(s) Enercon E70/E4 (power 2000 kW, diameter 70 m)
- Hub height: 65 m
- Total nominal power: 12,000 kW
- Operational
- Onshore wind farm
- Operator: Energiequelle
Part #2:
- Commissioning: 2006
- 4 turbine(s) (manufacturer name not available)
- Total nominal power: 8,000 kW
- Operational
- Onshore wind farm
Update for this sheet: 05/2012
Complete/correct this sheet: contact page