Hocheifel windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Hocheifel
- Country: Germany
- County / Zone: Nordrhein-Westfalen
- Total power: 11 MW
- Estimated annual production: 27 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 1999/12
- 2 turbine(s) Dewind D6-1000 (power 1000 kW, diameter 62 m)
- Hub height: 68.5 m
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 2000/01
- 1 turbine(s) Dewind D6-1000 (power 1000 kW, diameter 62 m)
- Hub height: 68.5 m
- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 2000/02
- 2 turbine(s) Dewind D6-1000 (power 1000 kW, diameter 62 m)
- Hub height: 68.5 m
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 2000/03
- 5 turbine(s) Dewind D6-1000 (power 1000 kW, diameter 62 m)
- Hub height: 68.5 m
- Total nominal power: 5,000 kW
- Operational
- Onshore wind farm
Part #5:
- Commissioning: 2000/11
- 1 turbine(s) Dewind D6-1000 (power 1000 kW, diameter 62 m)
- Hub height: 68.5 m
- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm
Update for this sheet: 04/2012
Complete/correct this sheet: contact page