Prony windfarm (France)
[Back to previous page]
Generalities
- Wind farm name: Prony
- Country: France
- County / Zone: 988
- Total power: 12 MW
- Estimated annual production: 30 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Part: Prony I
- City: Mont Dore
- Commissioning: 2002/12
- 10 turbine(s) Vergnet GEV 26/220 (power 220 kW, diameter 26 m)
- Hub height: 50 m
- Total nominal power: 2,200 kW
- Operational
- Onshore wind farm
- Developed by: Aerowatt
- Operator: Aerowatt
- Owner: Aerowatt
Part #2:
- Part: Prony II
- City: Mont Dore
- Commissioning: 2003/12
- 21 turbine(s) Vergnet GEV 26/220 (power 220 kW, diameter 26 m)
- Hub height: 50 m
- Total nominal power: 4,620 kW
- Operational
- Onshore wind farm
- Developed by: Aerowatt
- Operator: Aerowatt
- Owner: Aerowatt
Part #3:
- Part: Prony III
- City: Mont Dore
- Commissioning: 2007/04
- 20 turbine(s) Vergnet GEV MP 275/32 (power 275 kW, diameter 32 m)
- Hub height: 55 m
- Total nominal power: 5,500 kW
- Operational
- Onshore wind farm
- Developed by: Aerowatt
- Operator: Aerowatt
Update for this sheet: 05/2012
Complete/correct this sheet: contact page