Meineweh windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Meineweh
- Country: Germany
- County / Zone: Thüringen
- Total power: 10 MW
- Estimated annual production: 25 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2005
- 4 turbine(s) Vestas NM72 (power 1500 kW, diameter 72 m)
- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
- Developed by: WPD
Part #2:
- Commissioning: 2005
- 2 turbine(s) Vestas NM60 (power 1000 kW, diameter 60 m)
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
- Developed by: WPD
Part #3:
- Commissioning: 2004
- 1 turbine(s) Neg Micon NM48/750 (power 750 kW, diameter 48 m)
- Total nominal power: 750 kW
- Operational
- Onshore wind farm
- Developed by: WPD
Part #4:
- Commissioning: 2004
- 1 turbine(s) Vestas NM72 (power 1500 kW, diameter 72 m)
- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
- Developed by: WPD
Update for this sheet: 12/2010
Complete/correct this sheet: contact page