Dauer windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Dauer
- Country: Germany
- County / Zone: Brandenburg
- Total power: 12 MW
- Estimated annual production: 28 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2002/12
- 1 turbine(s) Fuhrländer FL MD/70 (power 1500 kW, diameter 70 m)
- Hub height: 65 m
- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
- Developed by: Boreas
- Operator: Natenco
Part #2:
- Commissioning: 1995/05
- 3 turbine(s) Neg Micon M1500-600 (power 600 kW, diameter 43 m)
- Total nominal power: 1,800 kW
- Operational
- Onshore wind farm
- Developed by: Boreas
Part #3:
- Commissioning: 2001
- 4 turbine(s) (manufacturer name not available)
- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 1994/01
- 1 turbine(s) Neg Micon
- Total nominal power: 250 kW
- Operational
- Onshore wind farm
- Developed by: Boreas
Part #5:
- Commissioning: 1994/05
- 1 turbine(s) Vestas V39/500 (power 500 kW, diameter 39 m)
- Total nominal power: 500 kW
- Operational
- Onshore wind farm
- Developed by: Boreas
Part #6:
- Commissioning: 2006
- 1 turbine(s) Repower MD70 (power 1500 kW, diameter 70 m)
- Hub height: 65 m
- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
- Developed by: Boreas