Sery windfarm (France)
[Back to previous page]
Generalities
- Wind farm name: Sery
- Country: France
- County / Zone: 02
- Total power: 30 MW
- Estimated annual production: 75 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Part: Partie 1
- City: Séry les Mézières
- Commissioning: 2009
- 3 turbine(s) Gamesa G90/2000 (power 2000 kW, diameter 90 m)
- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
- Developed by: Eole-Res
- Operator: Iberdrola Renewables
Part #2:
- Part: Partie 2
- City: Séry les Mézières
- Commissioning: 2009
- 4 turbine(s) Gamesa G90/2000 (power 2000 kW, diameter 90 m)
- Total nominal power: 8,000 kW
- Operational
- Onshore wind farm
- Developed by: Eole-Res
- Operator: Iberdrola Renewables
Part #3:
- Part: Partie 3
- City: Séry les Mézières
- Commissioning: 2009
- 8 turbine(s) Gamesa G90/2000 (power 2000 kW, diameter 90 m)
- Total nominal power: 16,000 kW
- Operational
- Onshore wind farm
- Developed by: Eole-Res
- Operator: Iberdrola Renewables
Update for this sheet: 05/2012