Perform 1 windfarm (Portugal)
[Back to previous page]
Generalities
- Wind farm name: Perform 1
- Country: Portugal
- County / Zone: Madeira
- Total power: 0 MW
- Estimated annual production: 0 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
- Commissioning: 1992
- 3 turbine(s) Nordtank NTK130/22 (power 130 kW, diameter 22 m)
- Total nominal power: 390 kW
- Operational
- Onshore wind farm
Update for this sheet: 04/2011
Complete/correct this sheet: contact page