Wind power and windfarms database
Greensolver

English English Deutsch Espa˝ol


Eoltech

Online access > Wind farms > Tomari (Japan)


[Back to previous page]

Generalities

Details



Part #1:


Part #2:

  • Commissioning: 1993
  • 1 turbine: (manufacturer name not available)
  • Total nominal power: 300 kW
  • Operational
  • Onshore wind farm
  • Operator: Hokkaido Electric Power Co

Part #3:

  • Commissioning: 1993
  • 1 turbine: (manufacturer name not available)
  • Total nominal power: 250 kW
  • Operational
  • Onshore wind farm
  • Operator: Hokkaido Electric Power Co

Localisation



Part #1:

  • Latitude: 35░ 32' 23.9"
  • Longitude: 135░ 42' 36"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 35░ 32' 23.9"
  • Longitude: 135░ 42' 36"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 35░ 32' 23.9"
  • Longitude: 135░ 42' 36"
  • Geodetic system: WGS84
  • Precise localization: no

Global map




Pictures



No photos for this wind farm.

Update for this sheet: 07/2015
Complete/correct this sheet:


www.thewindpower.net - 2005-2016 - all rights reserved - contact - partners - advertising