Thorntonbank windfarm (Belgium)
[Back to previous page]
Generalities
- Wind farm name: Thorntonbank
- Country: Belgium
- County / Zone: Offshore
- Total power: 325 MW
- Estimated annual production: 813 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2008/07
- 6 turbine(s) Repower 5M (power 5000 kW, diameter 126 m)
- Hub height: 94 m
- Total nominal power: 30,000 kW
- Operational
- Offshore wind farm
- Developed by: EDF-EN
- Operator: EDF-EN
- Owner: C-Power NV/RWE
Part #2:
- 30 turbine(s) Repower 6M (power 6150 kW, diameter 126 m)
- Total nominal power: 184,500 kW
- Under construction
- Offshore wind farm
- Developed by: C-Power NV
- Operator: C-Power NV
Part #3:
- 18 turbine(s) Repower 6M (power 6150 kW, diameter 126 m)
- Total nominal power: 110,700 kW
- Approved
- Offshore wind farm
- Developed by: C-Power NV
- Operator: C-Power NV
Update for this sheet: 05/2012
Complete/correct this sheet: contact page