Liancheng windfarm (China)
[Back to previous page]
Generalities
- Wind farm name: Liancheng
- Country: China
- County / Zone: Shandong
- Total power: 40 MW
- Estimated annual production: 100 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- City: Changdao
- Commissioning: 1999/05
- 9 turbine(s) Nordex N43/600 (power 600 kW, diameter 43 m)
- Total nominal power: 5,400 kW
- Operational
- Onshore wind farm
- Developed by: LuNeng
Part #2:
- City: Changdao
- Commissioning: 2003/12
- 2 turbine(s) Windey WD48-750 (power 750 kW, diameter 48 m)
- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
- Developed by: LuNeng
Part #3:
- City: Changdao
- Commissioning: 2003/10
- 2 turbine(s) Nordex N43/600 (power 600 kW, diameter 43 m)
- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
- Developed by: LuNeng
Part #4:
- City: Changdao
- Commissioning: 2004/08
- 7 turbine(s) Goldwind S43/600 (power 600 kW, diameter 43 m)
- Total nominal power: 4,200 kW
- Operational
- Onshore wind farm
- Developed by: LuNeng
Part #5:
- City: Changdao
- Commissioning: 2005/11
- 1 turbine(s) Windey WD48-750 (power 750 kW, diameter 48 m)
- Total nominal power: 750 kW
- Operational
- Onshore wind farm
- Developed by: LuNeng
Part #6:
Update for this sheet: 04/2012
Complete/correct this sheet: contact page