Rodovålen windfarm (Sweden)
[Back to previous page]
Generalities
- Wind farm name: Rodovålen
- Country: Sweden
- County / Zone: Jämtland
- Total power: 8 MW
- Estimated annual production: 20 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Part: Rodovalen 1
- City: Rodovålen
- Commissioning: 2003/03
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 850 kW
- Operational
- Onshore wind farm
- Operator: Agri-Vind AB
Part #2:
- Part: Rodovalen 2
- City: Rodovålen
- Commissioning: 2002/03
- 1 turbine(s) Bonus B44/600 (power 600 kW, diameter 44 m)
- Hub height: 40 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
- Operator: Agri-Vind AB
Part #3:
- Part: Rodovalen 3
- City: Rodovålen
- Commissioning: 2002/04
- 1 turbine(s) Neg Micon NM44/750 (power 750 kW, diameter 44 m)
- Hub height: 50 m
- Total nominal power: 750 kW
- Operational
- Onshore wind farm
- Operator: Agri-Vind AB
Part #4:
- Part: Rodovalen 4-5-6
- Commissioning: 2011/04
- 3 turbine(s) Enercon
- Total nominal power: 6,000 kW
- Operational
- Onshore wind farm
Update for this sheet: 04/2012
Complete/correct this sheet: contact page