Holleben windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Holleben
- Country: Germany
- County / Zone: Sachsen-Anhalt
- Total power: 26 MW
- Estimated annual production: 63 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
- City: Holleben
- Commissioning: 2004
- 17 turbine(s) GE 1.5sl (power 1500 kW, diameter 77 m)
- Total nominal power: 25,500 kW
- Operational
- Onshore wind farm
- Developed by: WPD
- Operator: e3 GmbH
Update for this sheet: 04/2013
Complete/correct this sheet: contact page