Barsinghausen windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Barsinghausen
- Country: Germany
- County / Zone: Niedersachsen
- Total power: 24 MW
- Estimated annual production: 59 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- City: Barsinghausen
- Commissioning: 1998/09
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 750 kW
- Operational
- Onshore wind farm
Part #2:
- City: Barsinghausen
- Commissioning: 2005/11
- 2 turbine(s) (manufacturer name not available)
- Total nominal power: 10,000 kW
- Operational
- Onshore wind farm
Part #3:
- City: Barsinghausen
- Commissioning: 2000/06
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
Part #4:
- City: Barsinghausen
- Commissioning: 2009/05
- 3 turbine(s) (manufacturer name not available)
- Total nominal power: 6,900 kW
- Operational
- Onshore wind farm
Part #5:
- Part: Groß Munzel
- City: Barsinghausen
- Commissioning: 2000/12
- 4 turbine(s) Neg Micon NM60/1000 (power 1000 kW, diameter 60 m)
- Hub height: 70 m
- Total nominal power: 4,000 kW
- Operational
- Onshore wind farm
- Developed by: Dezentrale Energie
- Operator: DEAG
Part #6:
- Part: Ostermunzel
- City: Barsinghausen
- Commissioning: 1996/10
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
- Developed by: Dezentrale Energie
Update for this sheet: 06/2013