Generalities

PDF

Details


Part #1:

  • City: Edemissen
  • Commissioning: 2005/10
  • 1 turbine: Vestas V80/2000 (power 2 000 kW, diameter 80 m)
  • Total nominal power: 2,000 kW
  • Operational
  • Onshore wind farm
  • Developer: Windstrom
  • Operator: Windstrom
  • Owner: Windstrom

       Production forecast

  • From Monday, February 20 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 75.4 %
  • Expected production: 36,200 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • City: Edemissen
  • Commissioning: 2001
  • 5 turbines: Bonus B62/1300 (power 1 300 kW, diameter 62 m)
  • Total nominal power: 6,500 kW
  • Operational
  • Onshore wind farm
  • Developer: Windstrom
  • Operator: Windstrom
  • Owner: Windstrom

       Production forecast

  • From Monday, February 20 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 69.1 %
  • Expected production: 107,790 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • City: Edemissen
  • Commissioning: 2005/11
  • 5 turbines: Bonus B82/2300 (power 2 300 kW, diameter 82.4 m)
  • Total nominal power: 11,500 kW
  • Operational
  • Onshore wind farm
  • Developer: Windstrom
  • Operator: Windstrom
  • Owner: Windstrom

       Production forecast

  • From Monday, February 20 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 73.2 %
  • Expected production: 202,140 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #4:

  • City: Edemissen
  • 13 turbines: (manufacturer name not available)
  • Total nominal power: 27,600 kW
  • Operational
  • Onshore wind farm
  • Developer: Windstrom
  • Operator: Windstrom
  • Owner: Windstrom

       Production forecast

  • From Monday, February 20 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 61 %
  • Expected production: 404,250 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation


Part #1:

  • Latitude: 52░ 23' 13.4"
  • Longitude: 10░ 15' 40.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 52░ 23' 13.4"
  • Longitude: 10░ 15' 40.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 52░ 23' 13.4"
  • Longitude: 10░ 15' 40.6"
  • Geodetic system: WGS84
  • Precise localization: no

Part #4:

  • Latitude: 52░ 23' 13.4"
  • Longitude: 10░ 15' 40.6"
  • Geodetic system: WGS84
  • Precise localization: no

Global map



Pictures


No photos for this wind farm.

Update for this sheet: 11/2016