Boryszewo windfarm (Poland)
[Back to previous page]
Generalities
- Wind farm name: Boryszewo
- Country: Poland
- Total power: 30 MW
- Estimated annual production: 75 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
- City: Darlowo
- 12 turbine(s) GE 2.5xl (power 2500 kW, diameter 100 m)
- Total nominal power: 30,000 kW
- Operational
- Onshore wind farm
- Developed by: Invenergy
- Operator: Invenergy
- Owner: Invenergy
Update for this sheet: 05/2012
Complete/correct this sheet: contact page