Wind power and windfarms database
Eoltech

English English Deutsch Espa˝ol


Eoltech

Online access > Wind farms > Gantikow (Germany)


[Back to previous page]

Generalities

PDF

Details



Part #1:

       Production forecast

  • From Saturday, June 25 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 12.6 %
  • Expected production: 3,030 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • Commissioning: 2001
  • 4 turbines: (manufacturer name not available)
  • Total nominal power: 4,000 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Saturday, June 25 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 18.3 %
  • Expected production: 17,540 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

       Production forecast

  • From Saturday, June 25 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 16.3 %
  • Expected production: 2,340 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation



Part #1:

  • Latitude: 52░ 58' 40.4"
  • Longitude: 12░ 21' 16.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 52░ 58' 40.4"
  • Longitude: 12░ 21' 16.9"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 52░ 58' 40.4"
  • Longitude: 12░ 21' 16.9"
  • Geodetic system: WGS84
  • Precise localization: no

Global map




Pictures



No photos for this wind farm.

Update for this sheet: /
Complete/correct this sheet:


www.thewindpower.net - 2005-2016 - all rights reserved - contact - partners - advertising