Wind power and windfarms database
Greensolver

English English Deutsch Espa˝ol


Eoltech

Online access > Wind farms > Plossig (Germany)


[Back to previous page]

Generalities

PDF

Details



Part #1:

  • City: Plossig
  • Commissioning: 2001
  • 2 turbines: (manufacturer name not available)
  • Total nominal power: 3,000 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Monday, September 26 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 2.3 %
  • Expected production: 1,640 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • City: Plossig
  • Commissioning: 2005
  • 2 turbines: (manufacturer name not available)
  • Total nominal power: 4,000 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Monday, September 26 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 2.3 %
  • Expected production: 2,190 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • City: Plossig
  • Commissioning: 2006
  • 2 turbines: (manufacturer name not available)
  • Total nominal power: 10,000 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Monday, September 26 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 2.3 %
  • Expected production: 5,470 kWh
  • Values from Climpact-Metnext Windcaster solution

Localisation



Part #1:

  • Latitude: 51░ 41' 45.3"
  • Longitude: 12░ 57' 11.8"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 51░ 41' 45.3"
  • Longitude: 12░ 57' 11.8"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 51░ 41' 45.3"
  • Longitude: 12░ 57' 11.8"
  • Geodetic system: WGS84
  • Precise localization: no

Global map




Pictures



No photos for this wind farm.

Update for this sheet: 07/2015
Complete/correct this sheet:


www.thewindpower.net - 2005-2016 - all rights reserved - contact - partners - advertising