Pico (Terras do Canto) windfarm (Portugal)
[Back to previous page]
Generalities
- Wind farm name: Pico (Terras do Canto)
- Country: Portugal
- County / Zone: Açores
- Total power: 2 MW
- Estimated annual production: 4 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
- Commissioning: 2005
- 6 turbine(s) Enercon E30/300 (power 300 kW, diameter 30 m)
- Total nominal power: 1,800 kW
- Operational
- Onshore wind farm
Update for this sheet: 04/2011
Complete/correct this sheet: contact page