La Dehesilla I windfarm (Spain)
[Back to previous page]
Generalities
- Wind farm name: La Dehesilla I
- Country: Spain
- County / Zone: Castilla y León
- Total power: 50 MW
- Estimated annual production: 125 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
- City: Ampudia
- 25 turbine(s) Gamesa G90/2000 (power 2000 kW, diameter 90 m)
- Total nominal power: 50,000 kW
- Operational
- Onshore wind farm
- Operator: Vapat
Update for this sheet: 03/2011
Complete/correct this sheet: contact page