Wind power and windfarms database
Greensolver

English English Deutsch Espa˝ol


Eoltech

Online access > Wind farms > Klim (Denmark)


[Back to previous page]

Generalities

Details



Part #1:

  • City: Klim
  • Commissioning: 1997/10
  • 22 turbines: Vestas V44/600 (power 600 kW, diameter 44 m)
  • Hub height: 45 m
  • Total nominal power: 13,200 kW
  • Operational
  • Onshore wind farm
  • Operator: Dong Energy

Part #2:

  • City: Klim
  • Commissioning: 1991/08
  • 0 turbines: Micon M530 (power 250 kW, diameter 26 m)
  • Hub height: 30 m
  • Total nominal power: 0 kW
  • Dismantled
  • Onshore wind farm

Part #3:

  • City: Klim
  • Commissioning: 1996/09
  • 13 turbines: Vestas V44/600 (power 600 kW, diameter 44 m)
  • Hub height: 45 m
  • Total nominal power: 7,800 kW
  • Operational
  • Onshore wind farm

Localisation



Part #1:

  • Latitude: 57░ 4' 47.9"
  • Longitude: 9░ 12' 36"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #2:

  • Latitude: 57░ 4' 47.9"
  • Longitude: 9░ 12' 36"
  • Geodetic system: WGS84
  • Precise location: yes
  • Google Maps view

Part #3:

  • Latitude: 57░ 4' 47.9"
  • Longitude: 9░ 12' 36"
  • Geodetic system: WGS84
  • Precise localization: no

Global map




Pictures



No photos for this wind farm.

Update for this sheet: 12/2015
Complete/correct this sheet:


www.thewindpower.net - 2005-2016 - all rights reserved - contact - partners - advertising