Méligny le Grand windfarm (France)
[Back to previous page]
Generalities
- Wind farm name: Méligny le Grand
- Country: France
- County / Zone: 55
- Total power: 8 MW
- Estimated annual production: 20 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
- City: Méligny le Grand
- Commissioning: 2006/12
- 4 turbine(s) Repower MM82 (power 2000 kW, diameter 82 m)
- Hub height: 80 m
- Total nominal power: 8,000 kW
- Operational
- Onshore wind farm
- Developed by: ABO-Wind
- Operator: WPD
- Owner: Breeze
Update for this sheet: 04/2012
Complete/correct this sheet: contact page