Gerdshagen-Rapshagen windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Gerdshagen-Rapshagen
- Country: Germany
- County / Zone: Brandenburg
- Total power: 15 MW
- Estimated annual production: 37 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2005/12
- 7 turbine(s) Vestas V90/2000 (power 2000 kW, diameter 90 m)
- Hub height: 105 m
- Total nominal power: 14,000 kW
- Operational
- Onshore wind farm
- Developed by: WKN AG
- Operator: WKN AG
- Owner: Difko A/S
Part #2:
- Commissioning: 2000
- 1 turbine(s) (manufacturer name not available)
- Total nominal power: 300 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 2000
- 3 turbine(s) (manufacturer name not available)
- Total nominal power: 750 kW
- Operational
- Onshore wind farm
Update for this sheet: 05/2012
Complete/correct this sheet: contact page