Part #1:

  • City: Uhre
  • Commissioning: 2000/07
  • 3 turbines: Bonus B62/1300 (power 1 300 kW, diameter 62 m)
  • Hub height: 69 m
  • Total nominal power: 3,900 kW
  • Operational
  • Onshore wind farm
  • Operator: Uhre Vinmollelaug

       Production forecast

  • From Saturday, February 25 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 57.4 %
  • Expected production: 53,710 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • City: Uhre
  • Commissioning: 1991/06
  • 1 turbine: Nordex N27/150 (power 150 kW, diameter 27 m)
  • Hub height: 40 m
  • Total nominal power: 150 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Saturday, February 25 2017, 01:00 UTC, for the coming 24 hours:
  • Expected load rate: 56.5 %
  • Expected production: 2,030 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • City: Uhre
  • Commissioning: 1989/08
  • 0 turbines: Wind World W2500/25 (power 150 kW, diameter 25 m)
  • Hub height: 31 m
  • Total nominal power: 0 kW
  • Dismantled
  • Onshore wind farm

Localisation


Part #1:

  • Latitude: 55░ 55' 53.5"
  • Longitude: 9░ 3' 3"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 55░ 55' 53.5"
  • Longitude: 9░ 3' 3"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 55░ 55' 53.5"
  • Longitude: 9░ 3' 3"
  • Geodetic system: WGS84
  • Precise localization: no

Global map



Pictures


No photos for this wind farm.

Update for this sheet: 07/2015