Wind power and windfarms database
Eoltech

English English Deutsch Espa˝ol


Eoltech

Online access > Wind farms > Uhre (Denmark)


[Back to previous page]

Generalities

PDF

Details



Part #1:

  • City: Uhre
  • Commissioning: 2000/07
  • 3 turbines: Bonus B62/1300 (power 1 300 kW, diameter 62 m)
  • Hub height: 69 m
  • Total nominal power: 3,900 kW
  • Operational
  • Onshore wind farm
  • Operator: Uhre Vinmollelaug

       Production forecast

  • From Sunday, July 24 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 3.7 %
  • Expected production: 3,450 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #2:

  • City: Uhre
  • Commissioning: 1991/06
  • 1 turbine: Nordex N27/150 (power 150 kW, diameter 27 m)
  • Hub height: 40 m
  • Total nominal power: 150 kW
  • Operational
  • Onshore wind farm

       Production forecast

  • From Sunday, July 24 2016, 02:00 UTC, for the coming 24 hours:
  • Expected load rate: 3.7 %
  • Expected production: 130 kWh
  • Values from Climpact-Metnext Windcaster solution

Part #3:

  • City: Uhre
  • Commissioning: 1989/08
  • 0 turbines: Wind World W2500/25 (power 150 kW, diameter 25 m)
  • Hub height: 31 m
  • Total nominal power: 0 kW
  • Dismantled
  • Onshore wind farm

Localisation



Part #1:

  • Latitude: 55░ 55' 53.5"
  • Longitude: 9░ 3' 3"
  • Geodetic system: WGS84
  • Precise localization: no

Part #2:

  • Latitude: 55░ 55' 53.5"
  • Longitude: 9░ 3' 3"
  • Geodetic system: WGS84
  • Precise localization: no

Part #3:

  • Latitude: 55░ 55' 53.5"
  • Longitude: 9░ 3' 3"
  • Geodetic system: WGS84
  • Precise localization: no

Global map




Pictures



No photos for this wind farm.

Update for this sheet: 07/2015
Complete/correct this sheet:


www.thewindpower.net - 2005-2016 - all rights reserved - contact - partners - advertising