Heden Timring windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Heden Timring
- Country: Denmark
- Total power: 7 MW
- Estimated annual production: 17 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2000/07
- 3 turbine(s) Bonus B54/1000 (power 1000 kW, diameter 54.1 m)
- Hub height: 47.9 m
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1999/11
- 3 turbine(s) Bonus B54/1000 (power 1000 kW, diameter 54.1 m)
- Hub height: 48 m
- Total nominal power: 3,000 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1999/11
- 1 turbine(s) Bonus
- Hub height: 48 m
- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm