Ll. Nørlund windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Ll. Nørlund
- Country: Denmark
- Total power: 5 MW
- Estimated annual production: 13 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2000/10
- 2 turbine(s) Neg Micon NM52/900 (power 900 kW, diameter 52 m)
- Hub height: 49 m
- Total nominal power: 1,800 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 2001/05
- 2 turbine(s) Neg Micon NM52/900 (power 900 kW, diameter 52 m)
- Hub height: 49 m
- Total nominal power: 1,800 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 2001/12
- 1 turbine(s) Neg Micon NM52/900 (power 900 kW, diameter 52 m)
- Hub height: 49 m
- Total nominal power: 900 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 2002/04
- 1 turbine(s) Neg Micon NM52/900 (power 900 kW, diameter 52 m)
- Hub height: 49 m
- Total nominal power: 900 kW
- Operational
- Onshore wind farm