Hovedgaard windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Hovedgaard
- Country: Denmark
- Total power: 4 MW
- Estimated annual production: 10 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 2002/11
- 2 turbine(s) Vestas V52/850 (power 850 kW, diameter 52 m)
- Hub height: 42 m
- Total nominal power: 1,700 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 2002/09
- 1 turbine(s) Vestas V52/850 (power 850 kW, diameter 52 m)
- Hub height: 49 m
- Total nominal power: 850 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1997/11
- 1 turbine(s) Bonus B44/600 (power 600 kW, diameter 44 m)
- Hub height: 60 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 1998/12
- 1 turbine(s) Bonus B44/600 (power 600 kW, diameter 44 m)
- Hub height: 60 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #5:
- Commissioning: 1997/11
- 1 turbine(s) Bonus B44/600 (power 600 kW, diameter 44 m)
- Hub height: 60 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm