Egense windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Egense
- Country: Denmark
- Total power: 5 MW
- Estimated annual production: 12 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 1999/10
- 1 turbine(s) Neg Micon NM48/750 (power 750 kW, diameter 48 m)
- Hub height: 50 m
- Total nominal power: 750 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1999/08
- 1 turbine(s) Neg Micon NM48/750 (power 750 kW, diameter 48 m)
- Hub height: 50 m
- Total nominal power: 750 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1997/04
- 1 turbine(s) Nordtank
- Hub height: 44.5 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 1997/04
- 2 turbine(s) Neg Micon
- Hub height: 44.5 m
- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
Part #5:
- Commissioning: 1999/08
- 1 turbine(s) Bonus
- Hub height: 45 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #6:
- Commissioning: 2000/11
- 2 turbine(s) Bonus B44/600 (power 600 kW, diameter 44 m)
- Hub height: 45 m
- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
Update for this sheet: 12/2010