Grurup windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Grurup
- Country: Denmark
- Total power: 3 MW
- Estimated annual production: 8 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 1996/06
- 1 turbine(s) Neg Micon NM44/750 (power 750 kW, diameter 44 m)
- Hub height: 48 m
- Total nominal power: 750 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1995/11
- 2 turbine(s) Neg Micon M1500-600 (power 600 kW, diameter 43 m)
- Hub height: 46 m
- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1995/12
- 1 turbine(s) Vestas V42/600 (power 600 kW, diameter 42 m)
- Hub height: 45 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 1993/03
- 1 turbine(s) Vestas V39/500 (power 500 kW, diameter 39 m)
- Hub height: 40.5 m
- Total nominal power: 500 kW
- Operational
- Onshore wind farm
Part #5:
- Commissioning: 1991/09
- 1 turbine(s) Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height: 31.5 m
- Total nominal power: 225 kW
- Operational
- Onshore wind farm