Pori 1 windfarm (Finland)
[Back to previous page]
Generalities
- Wind farm name: Pori 1
- Country: Finland
- Total power: 3 MW
- Estimated annual production: 6 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- City: Pori
- Commissioning: 1993/10
- 1 turbine(s) Neg Micon M750 (power 250 kW, diameter 31 m)
- Hub height: 31 m
- Total nominal power: 300 kW
- Operational
- Onshore wind farm
- Operator: Pori Energia
Part #2:
Update for this sheet: 03/2012
Complete/correct this sheet: contact page