Tversted windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Tversted
- Country: Denmark
- Total power: 3 MW
- Estimated annual production: 7 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 1999/11
- 2 turbine(s) Neg Micon NM44/750 (power 750 kW, diameter 44 m)
- Hub height: 40 m
- Total nominal power: 1,500 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 2000/01
- 1 turbine(s) Neg Micon NM44/750 (power 750 kW, diameter 44 m)
- Hub height: 40 m
- Total nominal power: 750 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1999/12
- 1 turbine(s) Neg Micon NM44/750 (power 750 kW, diameter 44 m)
- Hub height: 40 m
- Total nominal power: 750 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 1990/08
- 1 turbine(s) Wind World W150/27 (power 150 kW, diameter 27 m)
- Hub height: 31 m
- Total nominal power: 150 kW
- Operational
- Onshore wind farm