Vabensted windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Vabensted
- Country: Denmark
- Total power: 2 MW
- Estimated annual production: 4 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 1997/05
- 1 turbine(s) Neg Micon M1800-600/44 (power 600 kW, diameter 44 m)
- Hub height: 46 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1997/05
- 2 turbine(s) Neg Micon M1800-600/48 (power 600 kW, diameter 48 m)
- Hub height: 46 m
- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1992/11
- 1 turbine(s) Nordtank 150XLR (power 150 kW, diameter 24.6 m)
- Hub height: 32.5 m
- Total nominal power: 150 kW
- Operational
- Onshore wind farm