Hillested windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Hillested
- Country: Denmark
- Total power: 4 MW
- Estimated annual production: 10 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 1997/01
- 1 turbine(s) Neg Micon M1800-600/48 (power 600 kW, diameter 48 m)
- Hub height: 46.4 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1997/01
- 1 turbine(s) Neg Micon M1800-600/48 (power 600 kW, diameter 48 m)
- Hub height: 45 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1997/02
- 2 turbine(s) Neg Micon M1800-600/48 (power 600 kW, diameter 48 m)
- Hub height: 46 m
- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 1997/01
- 3 turbine(s) Neg Micon M1800-600/48 (power 600 kW, diameter 48 m)
- Hub height: 45 m
- Total nominal power: 1,800 kW
- Operational
- Onshore wind farm
Part #5:
- Commissioning: 1992/09
- 1 turbine(s) Wind World W150/27 (power 150 kW, diameter 27 m)
- Hub height: 31 m
- Total nominal power: 150 kW
- Operational
- Onshore wind farm