Dannemare windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Dannemare
- Country: Denmark
- Total power: 4 MW
- Estimated annual production: 9 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 1996/09
- 2 turbine(s) Bonus B44/600 (power 600 kW, diameter 44 m)
- Hub height: 35 m
- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 2000/02
- 1 turbine(s) Bonus B44/600 (power 600 kW, diameter 44 m)
- Hub height: 35 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1996/09
- 1 turbine(s) Wind World W3700/500 (power 500 kW, diameter 37 m)
- Hub height: 35 m
- Total nominal power: 500 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 1994/11
- 1 turbine(s) Bonus B31/300 (power 300 kW, diameter 31 m)
- Hub height: 30 m
- Total nominal power: 300 kW
- Operational
- Onshore wind farm
Part #5:
- Commissioning: 1994/12
- 2 turbine(s) Bonus B31/300 (power 300 kW, diameter 31 m)
- Hub height: 30 m
- Total nominal power: 600 kW
- Operational
- Onshore wind farm
Part #6:
- Commissioning: 1996/09
- 1 turbine(s) Bonus B33/300 (power 300 kW, diameter 33 m)
- Hub height: 31 m
- Total nominal power: 300 kW
- Operational
- Onshore wind farm
Part #7:
- Commissioning: 1991/11
- 1 turbine(s) Bonus B24/150 (power 150 kW, diameter 24 m)
- Hub height: 30 m
- Total nominal power: 150 kW
- Operational
- Onshore wind farm
Update for this sheet: 12/2010
Complete/correct this sheet: contact page