Kelstrup windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Kelstrup
- Country: Denmark
- Total power: 10 MW
- Estimated annual production: 25 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 1996/05
- 2 turbine(s) Neg Micon M1500-600 (power 600 kW, diameter 43 m)
- Hub height: 46.4 m
- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 2009/09
- 3 turbine(s) Vestas V90/3000 (power 3000 kW, diameter 90 m)
- Hub height: 80 m
- Total nominal power: 9,000 kW
- Operational
- Onshore wind farm
Update for this sheet: 12/2010
Complete/correct this sheet: contact page