Morum windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Morum
- Country: Denmark
- Total power: 2 MW
- Estimated annual production: 5 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 1997/06
- 2 turbine(s) Nordtank NTK600/43 (power 600 kW, diameter 43 m)
- Hub height: 50 m
- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1996/04
- 1 turbine(s) Nordtank NTK550/41 (power 550 kW, diameter 41 m)
- Hub height: 42 m
- Total nominal power: 550 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 1995/04
- 1 turbine(s) Nordtank NTK500/37 (power 500 kW, diameter 37 m)
- Hub height: 35 m
- Total nominal power: 500 kW
- Operational
- Onshore wind farm