Norrekær Enge windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Norrekær Enge
- Country: Denmark
- Total power: 30 MW
- Estimated annual production: 74 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 1990/04
- 0 turbine(s) Nordtank
- Hub height: 31 m
- Total nominal power: 0 kW
- Dismantled
- Onshore wind farm
Part #2:
- Commissioning: 1988/07
- 0 turbine(s) Nordtank
- Hub height: 26 m
- Total nominal power: 0 kW
- Dismantled
- Onshore wind farm
Part #3:
- Commissioning: 2009/08
- 6 turbine(s) Siemens SWT-2.3-93 (power 2300 kW, diameter 93 m)
- Hub height: 80 m
- Total nominal power: 13,800 kW
- Operational
- Onshore wind farm
- Operator: Vattenfall
Part #4:
- Commissioning: 2009
- 2 turbine(s) Siemens SWT-2.3-93 (power 2300 kW, diameter 93 m)
- Hub height: 80 m
- Total nominal power: 4,600 kW
- Operational
- Onshore wind farm
- Operator: Vattenfall
Part #5:
- Commissioning: 2010/07
- 1 turbine(s) Siemens SWT-2.3-93 (power 2300 kW, diameter 93 m)
- Hub height: 80 m
- Total nominal power: 2,300 kW
- Operational
- Onshore wind farm
- Operator: Vattenfall
Part #6:
- Commissioning: 2009
- 4 turbine(s) Siemens SWT-2.3-93 (power 2300 kW, diameter 93 m)
- Hub height: 80 m
- Total nominal power: 9,200 kW
- Operational
- Onshore wind farm
- Operator: Vattenfall
Update for this sheet: 10/2011
Complete/correct this sheet: contact page