Bovling windfarm (Denmark)
[Back to previous page]
Generalities
- Wind farm name: Bovling
- Country: Denmark
- Total power: 13 MW
- Estimated annual production: 31 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 1996/02
- 3 turbine(s) Vestas V42/600 (power 600 kW, diameter 42 m)
- Hub height: 40.5 m
- Total nominal power: 1,800 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 1993/02
- 0 turbine(s) Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height: 30.9 m
- Total nominal power: 0 kW
- Dismantled
- Onshore wind farm
Part #3:
- Commissioning: 1993/11
- 0 turbine(s) Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height: 30.9 m
- Total nominal power: 0 kW
- Dismantled
- Onshore wind farm
Part #4:
- Commissioning: 1994/04
- 0 turbine(s) Vestas V27/225 (power 225 kW, diameter 27 m)
- Hub height: 31.5 m
- Total nominal power: 0 kW
- Dismantled
- Onshore wind farm
Part #5:
- Commissioning: 2009/12
- 3 turbine(s) Siemens SWT-3.6-107 (power 3600 kW, diameter 107 m)
- Hub height: 80 m
- Total nominal power: 10,800 kW
- Operational
- Onshore wind farm
Part #6:
- Commissioning: 2008/11
- 0 turbine(s) Vestas V90/2000 (power 2000 kW, diameter 90 m)
- Hub height: 80 m
- Total nominal power: 0 kW
- Dismantled
- Onshore wind farm
Part #7:
- Commissioning: 2009/12
- 0 turbine(s) Vestas V100/1800 (power 1800 kW, diameter 100 m)
- Hub height: 107 m
- Total nominal power: 0 kW
- Dismantled
- Onshore wind farm
Update for this sheet: 12/2010
Complete/correct this sheet: contact page