Nusbaum windfarm (Germany)
[Back to previous page]
Generalities
- Wind farm name: Nusbaum
- Country: Germany
- County / Zone: Rheinland-Pfalz
- Total power: 12 MW
- Estimated annual production: 30 GW.h (for an equivalent of 2,500 hours of full load/year)
Details
Part #1:
- Commissioning: 1999/08
- 2 turbine(s) Dewind D4 (power 600 kW, diameter 48 m)
- Hub height: 70 m
- Total nominal power: 1,200 kW
- Operational
- Onshore wind farm
Part #2:
- Commissioning: 2000/09
- 8 turbine(s) Dewind D4 (power 600 kW, diameter 48 m)
- Hub height: 70 m
- Total nominal power: 4,800 kW
- Operational
- Onshore wind farm
Part #3:
- Commissioning: 2001/01
- 2 turbine(s) Dewind D6-1000 (power 1000 kW, diameter 62 m)
- Hub height: 68.5 m
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
Part #4:
- Commissioning: 2001/02
- 1 turbine(s) Dewind D6-1000 (power 1000 kW, diameter 62 m)
- Hub height: 68.5 m
- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm
Part #5:
- Commissioning: 2001/08
- 1 turbine(s) Dewind D6-1000 (power 1000 kW, diameter 62 m)
- Hub height: 68.5 m
- Total nominal power: 1,000 kW
- Operational
- Onshore wind farm
Part #6:
- Commissioning: 2001/12
- 2 turbine(s) Dewind D6-1000 (power 1000 kW, diameter 62 m)
- Hub height: 68.5 m
- Total nominal power: 2,000 kW
- Operational
- Onshore wind farm
Update for this sheet: 10/2010
Complete/correct this sheet: contact page